APPLICATION

Add space while limiting the weight added

A side extension, an additional storey or a roof-level volume: the low weight of a light steel frame can become a significant advantage. The solution is nevertheless chosen only after understanding what the existing structure, its supports and its foundations can genuinely carry.

Complete light steel frame installed above an existing building.

BEFORE CHOOSING THE FRAME

Read the existing structure, the junction and the new volume

Reading an extension or an additional storey in three partsSchematic section: at the centre, the existing building on its supports. Above it and to its side, two added volumes drawn with dashed lines. Between them, the old-to-new junction is marked by a thick continuous line, horizontal at roof level and vertical along the facade. The drawing carries no dimensions.Added volumeOld-to-new junctionExisting buildingExtension

The existing building

Identify the load-bearing system, the supports, the known condition, the current loads, the documented foundations and the uncertainties that call for a survey or a further study.

The old-to-new junction

Design the load transfer, the connections, the differences in movement, the roof junction, the weathertightness, the façades and the service routes.

The new volume

Define the use, the storeys, the openings, the roof, the envelope, the loads and the erection sequence of the added project.

An advantage to be verified, not an exemption from study

Limited superstructure weight

It can reduce the loads added compared with heavier comparable solutions, without on its own demonstrating the capacity of the existing structure.

Upstream preparation

Sections, perforations, identification marks and panels can be prepared before working on a site that is often constrained.

Largely dry assembly

It can make it easier to organise an occupied or hard-to-reach site where protection and sequences have been planned.

Choose the level of prefabrication according to the site

Structure Kit

Transport is more compact and the components can be assembled progressively on site. This option calls for an organised local team and a controlled working area.

Panel Kit

Pre-assembly reduces local structural work, but the size of the panels increases the requirements for transport, handling, lifting and storage.

Access, occupation of the building, the crane available, temporary protection and the connection sequence can weigh as much as the geometry of the extension.

PREPARING THE STUDY

Document the existing structure before concluding

Send the drawings of the existing building and of the added project, photographs, the location, any available surveys, the known structure, the foundations if documented, the intended use, the access, the lifting equipment and any studies already carried out.

Have the existing structure and the interfaces assessed before choosing the solution.